Raba

Raba

Project:

Raba Südwest Thüringen

Object:

Waste incineration plant

Client:

ABB Schweiz

End customer:

Zweckverband für Abfallwirtschaft, southern Thuringia

Place of implementation:

Zella-Mehlis

Implementation period:

June 2006 - November 2007

Contract value:

EUR 1.5 million

Sector:

Conventional power plant engineering

Project details


Task:

  • Cooling in summer
  • Air heating for winter operation
  • Increased noise control
  • Implementation of fire protection concept

Solution:

Mechanical ventilation for cooling in summer and heating in winter for the turbine hall / boiler house and refuse pit. Sound-insulated cooling and ventilation systems for the switchgear building. Ventilation systems for neighbouring buildings, including heating. Active / passive smoke extraction systems.